Sullivan Road West Bridge Replacement

Spokane Valley, WA: Replacement of the west bridge over the Spokane River.

Project Details

In 2009, the westbound Sullivan bridge over the Spokane River was rated as structurally deficient, resulting in strict load restrictions. Kuney was awarded the contract to demolish and replace the bridge in place, working around tight in-water work windows. Kuney deployed innovative means and methods for both containing demolition and accessing new bridge construction, using its company-owned work trestle. To protect the environment, bubble curtains were deployed during pile driving activities for fish protection, and river turbidity was constantly monitored.

Project specs

  • Location: Spokane Valley, Washington
  • Owner: City of Spokane Valley
  • Timeframe: 2014-2017
  • Size: $12.3 Million
  • More Information: http://spokanevalley.org/sullivanbridge