I-90 Cle Elum Bridges Deck Rehabilitation

Project Details

This project is adjacent to the Yakima river two miles east of Cle Elum exit 80 on I-90. The two I-90 bridge decks crossing S Cle Elum Way and BNSF railroad tracks showed signs of deterioration. This project repaired and resurfaced the existing bridge decks to maintain structural integrity and extend the life of the bridges. Detours of I-90 in both directions, including assembly of a 400’ long temporary Acrow bridge were constructed to maintain two lanes of traffic along I-90 in both directions throughout the duration of the project.

Project Specs

Location

Cle Elum, Washington

Owner

Washington State Department of Transportation (WSDOT)

Completion

2025

Size

$10-$50m

Project Gallery