LHTAC – Canyon Road Bridge Replacement

Project Details

Kuney was awarded the LHTAC – Canyon Road Bridge Replacement job in early September of 2025. The project itself is located approximately 100 yards up-river from the I-90 CDA River Bridge project. This project was designed by the same firm, and has very similar characteristics to the I-90 CDA River Bridges.

Kuney began construction in October of 2025 with the start of work bridge installation across the CDA River. While work bridge is being erected through the winter, Kuney crews will also be removing the concrete off the existing truss. The truss will be relocated and salvaged by another contractor. Once the truss has been relocated, crews will be moving forward with complete demo of the existing substructure, as well as construction of the new bridge elements. This includes 4 in-water drilled shafts and piers, two abutment piers and a precast girder superstructure.

Kuney is anticipating a late Fall of 2026 opening of the Canyon Road Bridge

Project Specs

Location

Cataldo, ID

Owner

Kootenai County

Completion

2026

Size

< $10m

Project Gallery

READY TO START YOUR PROJECT?

Whether you are a potential new client, partner or subcontractor, please get in touch with us if you are
interested in working with Kuney or learning more about our experience and capabilities.

CONTACT US SEE OUR PROJECTS