Upriver Dam Spillway Rehabilitation – Phase III

Project Details

Constructed in 1937, the Upriver dam is a 229 ft long concrete gravity dam that generates power to operate the pumping system responsible for providing roughly 180 million gallons of drinking water to the City of Spokane per day. Kuney Construction has been contracted to rehabilitate several different structural concrete elements throughout the dam, along with performing substantial repairs to one of the eight spillway Tainter gates.

Project Specs

Location

Spokane, Washington

Owner

Avista

Completion

2024

Size

< $10m

Project Gallery