107c & CSO 34-1 Control Facilities
In Spokane, WA, we constructed two new CSO tanks.
Project Details
On this project we constructed two combined sewer overflow (CSO) tanks. The smaller tank has a 200,000 gallon capacity while the large tank has a 1.5 million gallon capacity. The work includes lift station, mechanical and electrical components, storm, sanitary and CSO utilities.
Project specs
- Location: Spokane, WA
- Owner: City of Spokane
- Timeframe: 2017-2020
- Size: $14.6



